JUDICIARY
The Chief Justice has gazetted the list of 123 election petitions challenging the positions of Governor, Senator, Woman Representative, MP and MCA across multiple counties.
FINANCE SECTOR
The Cabinet Secretary for the National Treasury and Planning, Ukur Yatani, has gazetted the Statement of Actual Revenues and Net Exchequer Issues as at August 31, 2022. Below is a summary of the statement:
● TOTAL REVENUE
○ Original Estimates – 3,544,602,089,866.00
○ Actual Receipts – 383,374,426,372.20
● Total Recurrent Exchequer Issues
○ Original Estimates – 1,178,399,125,393.00
○ Exchequer Issues – 149,389,735,744.10
● Total CFS Exchequer Issues
○ Original Estimates – 1,571,810,752,102.00
○ Exchequer Issues – 183,509,613,759.15
● Total Development Exchequer Issues
○ Original Estimates (Kshs) – 424,392,212,371.00
○ Exchequer Issues (Kshs) – 20,754,739,931.85
● TOTAL ISSUES TO NATIONAL GOVERNMENT
○ Original Estimates (Kshs) – 3,174,602,089,866.00
○ Exchequer Issues (Kshs) – 353,654,089,435.10
● Total Issues–Equitable Issues
○ Original Estimates (Kshs) – 370,000,000,000.00
○ Total Cash Released (KSh.) – 30,243,225,095.00
● GRAND TOTAL
○ Original Estimates (Kshs) – 3,544,602,089,866.00
○ Exchequer Issues (Kshs) – 383,897,314,530.10
Exchequer Balance as at 31.08.2022 – 93,660,793.70
ENERGY SECTOR
The Director-General of the Energy and Petroleum Authority has gazetted a list of electrical energy that will be liable to:
● A fuel energy cost charge of plus 679 Kenya cents per kWh for all meter readings to be taken in September 2022.
● A Foreign Exchange Fluctuation Adjustment of Plus 136.85 Cents per kWh for all meter readings taken in September 2022.
● A Water Resource Management Authority (WRMA) Levy of Plus 1.26 Cents per kWh for all meter readings take in September 2022.
● An Inflation Adjustment of plus 67 Cents per kWh for all meter readings taken in September–December, 2022.
LAND & ENVIRONMENT SECTOR
Completion Part Development Plan
● Title of Development Plan; REF: NRB/17/2022/01, Existing Site For Civil Servants Housing, Eldoret Municipality.
● Title of Development Plan; REF: NRB/21/2022/01, Existing Site For Civil Servants Mortage Scheme-Embu Municipality.
● Title of Development Plan; REF: NRB/16/2022/01, Existing Site For Civil Servants Housing, Kakamega Municipality.
● Title of Development Plan; REF: NRB/9/2022/01, Existing Site For Civil Servants Housing Fund, Kisumu City.
● Title of Development Plan; REF: NRB/53/22/01, Existing Site For Civil Servants Housing, Ruiru Municipality.
● Title of Development Plan; REF: NRB/4/2022/01, Existing Site For Civil Servants Housing, Thika Municipality.
● Title of Development Plan; REF: NRB/37/2022/01, Existing Site For Civil Servants Housing, Kisii Municipality.
● Title of Development Plan; REF: NRB/167/2022/01, Existing Site For Civil Servants Housing, Meru Municipality.
Environmental Impact Assessment
● Tononoka Rolling Mills Limited, proposes to install a hot structural section mill in addition to the existing rolling mill. The project entails the construction of office blocks, oxygen plant, a melting shop, fuel storage plant and a scrap shed. The proposed project will be located on Plot No. 12034/2, off Komarock Road, Dandora, Embakasi-North Sub-county, Nairobi City County.
● Symphony Residences Limited, proposes to construct a residential development that will entail 2 basements, ground floor and 22 floors consisting of 396 residential units. The development will include 264 one-bedroom units, 44 two-bedroom units, 88 three-bedroom units, parking slots, meeting room, mosque, lounge, kids’ area, shops, game rooms, Jacuzzi, office place space, a gym and associated facilities and amenities on Plot L.R. No. 330/1287, along Riara Road on Nairobi City County.
● Meru Bongo and Rhino Conservation Trust in partnership with County Government of Meru proposes to establish a mountain bongo and black rhino sanctuary in Marania and Mucheene forest in Mount Kenya Ecosystem in Meru County. The project is expected to be undertaken in two phases with Phase 1 targeting the introduction of bongos into a sanctuary covering an area of 500 acres. Phase 2 will target the reintroduction of the black rhinoceros.